Property:Riskisundmus EN
Allikas: TalTechi arhitektuur
Võimalik sündmus / Possible event Ingliskeelne tekst.
K
Operating costs exceed available resources before the university can adapt its activities. +
L
A workplace conflict is not resolved early and escalates. +
The university accepts a contractual obligation or restriction whose impact has not been sufficiently assessed before signature. +
M
A significant hazard remains unidentified or unresolved and causes an incident or accident. +
P
A power quality disturbance damages equipment, changes its operating mode or causes data loss. +
A material project requirement is not identified or met in time. +
An accident during work or study harms a person’s health or property. +
An employee develops a mental health problem and their capacity for work declines. +
R
Recruitment or onboarding of international students and staff decreases substantially. +
Funding for the university’s responsibilities and strategic activities decreases, is delayed or becomes unstable. +
T
TalTech’s role in technology and engineering education or state-designated professorships weakens. +
The investment and recurring funding plan fails to cover a critical infrastructure need in time. +
A study begins or continues without meeting a material research ethics requirement. +
A study is conducted or its results published in a manner that breaches good research practice. +
The university does not establish or maintain a tenure position required for a strategic field. +
The university lacks timely funding to meet a material commitment or continue a core activity. +
A staff member or student submits sensitive information to an AI service unsuitable for that information. +
V
A partner obtains access to sensitive information, infrastructure or a network in a way that harms university interests. +
A critical university digital service becomes unavailable because of the attack. +
Data or results used by the university are altered without authorisation and the change is not detected in time. +
